Completed Projects

Contract No: MW/18/2013
Client/ Developer:
Umhlatuze Municipality
Engineer: AECOM
Duration: 13 Months
Value: 30 Million

Contract Description:
Installation of Civil and Mechanical for Nsezi city of Mthlathuze Highlift Pump station


Client:  Ilembe district municipality
Engineer:  Aecom
Duration:  8 months
Value: R12,9 million

Contract Description:
Construction of a 3200KL reservoir , 300KL reservoir and pump station.

Contract No: 602
Client: Island View Storage (Pty) Ltd
Engineer: Elliot, Breytenbach Consulting Engineers
Duration: 12 months
Value: R 31 000 000.00

Contract Description:
Island View Storage (Richard’s Bay) Construction of 19no. new tank base foundations, bund walls and bund paving and drainage. New rail tank car decanting aprons with associated cut-off channels and drains as well as major spill sumps. Construction of a road loading facility with associated cut-off channels, drains and spillage sumps. Construction of pump bays for rail decanting and shipping, site drainage and roads and security fencing.

Contract No: 610
Client: D C Earthworks
Engineer: SSI
Duration: 5 months
Value: R5 500 000.00

Contract Description:
The construction of a Pedestrian foot bridge (mainly consisting of 2no. precast beams spanning +- 33m). Piled foundations to abutments as well as safe to use access ramps and precast balustrades.

Contract No: WS 5695
Client: Ethekwini Municipality
Engineer: Stewart Scott International
Duration: 8 months
Value: R14 650 000.00

Contract Description:
Addition of a new 32.4m diameter clarifier and all associated pipeworks etc. The clarifier was to be founded on precast driven piles, which design criteria included refusal against upward movement (floating) due to the high water table in the area. Large dia. HDPE pipes laid in deep water logged trenches under difficult circumstances.

Contract No: 243/173/001
Client: Effingham Development JV (Tongaat Hulletts)
Engineer: Stemele Bosch Africa
Duration: 8 months
Value: R17 500 000.00

Contract Description:
Construction of a road over rail bridge for Bridge city.

Contract No: NRA N003-010-2005/2
Client: SANRAL
Engineer: P D Naidoo & Associates
Duration: 10 months
Value: R8 250 000.00

Contract Description:
The contract consisted of the widening of the existing marianhill bridge over the N3 freeway, from Durban to Pietermarizburg.

Contract No: SDM/86/3/MIG/06
Client: Sisonke District Municipality
Engineer: Ninham Shand
Duration: 9 months
Value: R18 956 000.00

Contract Description:
The construction of a rectangular “Pulsator” clarifier, filter building, related interlinking pipework, staff quarters building, construction of an earth dam as well as various other modifications to existing structures and pipeworks.

Contract No: 364
Client: EthekwIni Municipality
Engineer: City Engineers Department
Duration: 10 months
Value: R6 906 000.00

Contract Description:
Construction of a 7.5 ML reinforced concrete reservoir, associated earthworks, pipeworks, valves and steelwork.

Client/ Developer: Little Rock Trading
Engineer: Impact
Duration: 24 months
Value: R55 500 000.00

Contract Description:
The construction of 15 up-market residential homes within the Kiribati complex, including all relevant civil infrastructures. The development is located in the Zimbali Eco estate.

Contract No: 8/2/1/57
Client/ Developer:
 Umhlatuze Water
Engineer: Bigen Africa
Duration: 14 months
Value: 30.6 Million

Contract Description:
Reinforced Concrete Domed Roof Reservoir of 20Ml and Associated Pipeworks

Client/ Developer: MAN Truck & Bodies
Engineer: Martin & Associates
Duration: 3 months
Value: R 2.2 million

Contract Description:
Replace existing asphalt drive with concrete surface bed, including subsoil drainage

Client/ Developer:  Sappi
Engineer:  Mott MacDonald Consulting Engineers
Duration:  2 Months
Value:  R 1.3 million

Contract Description:
Construct new reinforced concrete Turbine Base

Contract: Project Vuselela
Client/ Developer:
Sappi Specilised Cellulose
Engineer: Mot MacDonald
Duration: 2 Months
Value: R 2,3 Million

Contract Description:
Construction of Reinforced Condensing Turbine Raft Slab constructed on piles, as well as the Turbine and Alternator Reinforced Concrtete bases. Includedin the workwas a 4m deep Caisson Sump and external overhead crane supports.

Contract No: NRA P006-041-2012/1
Client/ Developer:
Sanral
Engineer: Royal Haskoning DHV
Duration: 10 Months
Value: 18 Million

Contract Description:
Model Kloof Pedestrian Bridge Ladysmith, Constructed of the N11 between the local residential area and the school, with a 2km concrete walkway.

Contract No: ZNT2957/10T
Client/ Developer:
Department of Transport
Engineer: Royal Haskoning DHV
Duration:  18 Months
Value:  R34,3 million

Contract Description:
Construction of insitu concrete bridge on the M41 over the Umdloti river

Contract No: 1R-6248
Client/ Developer:
Ethekwini Municipalty
Engineer:  Peter Fenton
Duration:  18 months
Value:  R 34 million

Contract Description:
Construction of a 10.5m wide bridge over the Mhlangane river and roadworks.

Contract No: 1T-10204
Client/ Developer:
Ethekwini Municipality
Engineer: Ethekwini Municipality
Duration: 44 weeks
Value: R 21.5 Million

Contract Description:
Repair and widening of Ellis Brown viaduct




Contract No: WS6183
Client/ Developer:
Ethekwini Water and Sanitation Dpartment of Water Services
Engineer: Mott MacDonald PDNA
Duration: 10 Months
Value: R 4.5 Million

Contract Description:
1 Ml Reinforced Concrete Reservoir, ancillary structures and pipework.




Contract No: 1R 4640
Client: EthekwIni Municipality
Engineer: City Engineers Department (Kordian Ignatiuk)
Duration: 8 months
Value: R 6 000 000.00

Contract Description:
The contract comprises of a Pedestrian Bridge over the Umlaas River, which will link Lemontville and the Umlazi Mega City Shopping complex. The contract requires post tensioned bridge of 4 No. 35m spans over the river with piled foundations. Furthermore the construction of a 550m pedestrian footpath.

Contract No: 1H 5007
Client: Ethekwini Municipality Housing Department
Engineer: Vela VKE & SLB Consulting
Duration: 8 months
Value: R 7 250 000.00

Contract Description:
The construction of a road over rail bridge across the main railway line between Durban and Stanger. The bridge construction involved the precast construction of 27 beams spanning a distance of between 8 - 12m as well as all associated bridge works.

Contract No: WS 5948
Client: Ethekwini Municipality
Engineer: Naidu Consulting
Duration: 8 months
Value: R 7 250 000.00

Contract Description:
The contract comprises of the construction of a 6 Megalitre reinforced concrete reservoir and associated chambers as well as 650m of 400mm dia. steel inlet pipe, 650m of 500mm dia. steel outlet pipe. Further to the above is a 1440mm dia. pipe jacking crossing the R102 as well as the construction of access road, parking area and stormwater drainage.

Contract No: SPU 06/08
Client: Ethekwini Municipality
Engineer: BKS (Suncontract to Afrocon)
Duration: 10 months
Value: R 33 000 000.00

Contract Description:
Consisted of +- 6000m3 of pigmented concrete paving laid at 160 – 200mm thick stretching over a 5km length on the beachfront promenade. The existing 2km of precast seawall covers were removed and replaced be newly designed – concrete polished sections. Various additional items (1500m of insitu concrete stairs, alterations to sand and sewer pumpstations, 1500m3 of polished concrete to band strips etc).

Contract No: SPU 06/08
Client: SANRAL
Engineer: GOBA
Duration: 9 months
Value: R 33 000 000.00

Contract Description:
The Bridgeworks consists of two separate post-tensioned double-box girders spanning 33m onto counterfort wall type abutments. The abutments are supported on CFA piles augered into the dense Berea Red sands underlying the site.

About us

Afrostructures (Pty) Ltd is a specialised, structural concrete contracting Company, which includes a well-established building division.